New Nagaa Hammadi Barrage & Hydropower Plant

Project

New Nagaa Hammadi Barrage & Hydropower Plant

Client

Ministry of Water Resources and Irrigation

Location

Egypt

Description

The new Naga Hammadi Barrage & Hydropower Plant is a multipurpose project including a 330m long dam to replace a structure built in the early 1990s and produce 64 MW through the associated hydropower plant. This involves diverting the path of the Nile.

The scope covers the following works:

River diversion, protection of river channel, right bank closure dike, sluice way, power house, double navigation lock (217m each way), service building and public road bridge.

Timeline

2002 to 2008


Back to case studies